Gemini South Status

Validity ToO Availability Instruments Availability Comment GMOS Config Open Status
Valid until 22-11-2024 Available for Target of Opportunity tonight GMOS-S Flamingos-2 Click Here CLOSED (as of 11/21/2024, 06:45:03 local time).
ESO GOES Satellite (VIS & Thermal IR)
ESO GOES Satellite (Cloud Top)
Site Conditions
Description of Webpage Plots and Values
Relative Humidity: 32%foo
Temparature: 9.9°C
Wind Speed: 8.5 m/s
Wind Direction: 300°
Telescope Azimuth: 147.0°
300
Dew Point:: -6.0°C
DIMM Seeing: 0.453"
MASS Seeing: 0.370"