[Mayan calendar]

Fast Turnaround Queue Summary : Semester 2015A GN

The tables below summarise the programs that constitute the Fast Turnaround program queue on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2015A-FT-1 Lunnan US Late-Time Spectroscopy of the Extraordinary Superluminous Supernova PS1-14bj GMOS 3.00
Execution Status: complete Dates Taken:
20150311 20150328
Completion Status:
100%
GN-2015A-FT-2 Maksym US Spectral Evolution and Host of an X-ray Bright Tidal Flare at Only 90 Mpc GMOS 4.20
Execution Status: complete Dates Taken:
20150315 20150329 20150401 20150416
Completion Status:
100%
GN-2015A-FT-3 Van Kerkwijk CA Late time Near Infrared spectroscopy of SN2014J GNIRS 3.00
Execution Status: complete Dates Taken:
20150315 20150426 20150524
Completion Status:
100%
GN-2015A-FT-8 Scarlata US Ionized gas conditions in the first known OVI emitting starburst galaxy GMOS 5.50
Execution Status: complete Dates Taken:
20150508 20150515 20150521 20150607 20150609
Completion Status:
100%
GN-2015A-FT-9 Lacy US Weighing the super-massive black hole in luminous QSO J1554+1937 GNIRS 1.40
Execution Status: complete Dates Taken:
20150331
Completion Status:
100%
GN-2015A-FT-14 Milisavljevic US The Unprecedented Supernova Metamorphosis of SN 2014C GMOS / GNIRS 3.30
Execution Status: complete Dates Taken:
20150518 20150526 20150527
Completion Status:
100%
GN-2015A-FT-17 Romani US The PSR J2030+4415 Bowshock: Close or Fast? GMOS 2.00
Execution Status: complete Dates Taken:
20150618 20150623 20150627 20150628
Completion Status:
100%
GN-2015A-FT-18 Meech UH Enigmatic Novel PanSTARRS Discoveries-Testing Solar System Formation Models GMOS 1.33
Execution Status: complete Dates Taken:
20150606 20150612
Completion Status:
100%
GN-2015A-FT-19 Hsieh US Search for Sublimation-Driven Dust Emission from Asteroid (24) Themis GMOS 2.60
Execution Status: complete Dates Taken:
20150609 20150612
Completion Status:
100%
GN Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2015A-FT-4 U US Nature and Dynamics of Clumps in Star-Forming Galaxies at z ~ 1-2 NIFS+AltairLGS 1.50
Execution Status: Dates Taken:
20150509
Completion Status:
33%
GN-2015A-FT-5 Montiel US Observations of SU Tauri While In Deep Decline GMOS 0.60
Execution Status: complete Dates Taken:
20150315
Completion Status:
100%
GN-2015A-FT-6 Hlavacek-Larrondo CA Hunting down the most massive black hole in the Universe GMOS 3.80
Execution Status: Dates Taken:
20150426 20150428
Completion Status:
34%
GN-2015A-FT-7 Boyer US AGB Star Dust Production at Extremely Low Metallicity NIRI 3.30
Execution Status: complete Dates Taken:
20150402
Completion Status:
100%
GN-2015A-FT-10 Cote CA The Most Massive UCD? Internal Dynamics and Black Hole Content from NIFS Spectroscopy NIFS+AltairLGS 6.00
Execution Status: Dates Taken:
20150630
Completion Status:
13%
GN-2015A-FT-11 Meech UH Enigmatic Novel PanSTARRS Discoveries--Testing Solar System Formation Models GMOS 1.70
Execution Status: complete Dates Taken:
20150609 20150610
Completion Status:
100%
GN-2015A-FT-12 Corlies US Investigating seasonal changes in Titan's meteorology through cloud monitoring with NIRI NIRI+Altair / NIRI+AltairLGS 0.50
Execution Status: complete Dates Taken:
20150415 20150426 20150427
Completion Status:
100%
GN-2015A-FT-15 Johnson US Resolving star forming clumps in a lensed z=2.5 galaxy: supporting ground-based spectroscopy of secondary arcs in the field of SGAS 1110 GMOS 4.75
Execution Status: Dates Taken:
20150509 20150614 20150615 20150618 20150718
Completion Status:
57%
GN-2015A-FT-16 Gladders US Time delays for the sextuply-lensed quasar SDSS J2222+2745 from GMOS GMOS 1.90
Execution Status: complete Dates Taken:
20150523 20150526 20150527 20150725
Completion Status:
100%
GN-2015A-FT-20 Ebeling UH GRI imaging of massive galaxy clusters at z>0.5 GMOS 1.50
Execution Status: complete Dates Taken:
20150606 20150609
Completion Status:
100%
GN-2015A-FT-21 Corlies US Investigating seasonal changes in Titan's meteorology through cloud monitoring with NIFS NIFS+Altair / NIFS+AltairLGS / NIRI+Altair 1.10
Execution Status: complete Dates Taken:
20150608 20150609 20150630 20150827
Completion Status:
100%
GN Fast Turnaround Time Queue Band 3
Ref # PI Partner Title Instrument Hours
allocated
GN-2015A-FT-13 Hall CA Contemporaneous spectra of BAL quasars observed with Chandra GMOS 2.90
Execution Status: Dates Taken:
20150415 20150526
Completion Status:
45%
GN-2015A-FT-22 Rawlings US Searching for near-IR Diffuse Interstellar Bands towards Herschel 36 GNIRS 1.90
Execution Status: complete Dates Taken:
20150602
Completion Status:
100%
GN-2015A-FT-23 Fu US Follow-up of dying ultra-luminous quasars GMOS 7.60
Execution Status: complete Dates Taken:
20150526 20150609 20150618 20150623 20150624 20150629
Completion Status:
100%

 

[Science Operations home] [schedules home]